UNSW FACILITIES DESIGN & CONSTRUCTION REQUIREMENTS (LAST UPDATED FEB 2009)


These REQUIREMENTS have been prepared by UNSW Facilities to document design criteria for all renovations, additions and new construction. The REQUIREMENTS have been jointly prepared by persons responsible for the planning, construction and maintenance of the University's facilities. This information is provided to achieve quality campus structures and landscapes requiring minimum maintenance effort and operating expense.

Adherence to the REQUIREMENTS is required. Any deviations for equal or improved concepts, methods or products must be called to the attention of, and reviewed with the relevant Project Manager, and receive written approval before implementation.

These REQUIREMENTS do not relieve the Consultant's responsibility for providing complete and accurate Contract Documents.

The REQUIREMENTS will undergo revisions on the basis of individual Sections as required. . The date above signifies the last date one of the sections has been updated. This revision will supersede all previous additions and construction practices for UNSW. The date each section was last revised is shown alongside each. Consultants should check the Revision/Date against their appropriate Sections to ensure they are using the most current version.

To facilitate downloading, the REQUIREMENTS are presented as separate documents in pdf format, the titles of which are presented below. To download the required document the user must click on the relevant heading.

SECTION A – INTRODUCTION Rev 4.1 (August 2004)

SECTION B – DEVELOPMENT & PLANNING Rev 4.1 (August 2004)

SECTION C – ARCHITECTURAL REQUIREMENTS Rev 4.1 (July 2007)

SECTION D – EXTERNAL WORKS Rev 4.1 (August 2004)

SECTION E.1 – HYDRAULIC SERVICES Rev 4.1 (July 2007)

SECTION E.2 – MECHANICAL SERVICES Rev 4.1 (August 2004)

SECTION E.3.1 – ELECTRICAL SERVICES Rev 4.1 (November 2005)

SECTION E.3.2 – LIGHTING Rev 4.1 (November 2004)

SECTION E.3.3 – SPECIAL SYSTEMS Rev 4.2a (Dec 2006)

SECTION E.3.4 – HIGH VOLTAGE Rev 4.1 (Sept 2004)

SECTION E.4 – COMMUNICATIONS Rev 4.1 (August 2004)

SECTION E.5 – LIFTS Rev 4.1 (August 2004)

SECTION E.6 – FUME CUPBOARDS Rev 4.1 (August 2004)

SECTION F – SPECIFIC AREA REQUIREMENTS Rev 4.2 (Dec 2006)

APPENDIX 1 – BUILDING AUTOMATION AND CONTROL SYSTEMS SPECIFICATION Rev 4.1 (July 2005)

APPENDIX 2 – CONCRETE FOR STRUCTURES Rev 4.1 (August 2004)

APPENDIX 3 – UNSW CONTROL SYSTEM STANDARD HVAC Rev 4.1 (August 2004)

APPENDIX 4 – DOCUMENT REQUIREMENTS Rev 4.2 (Dec 2006)

APPENDIX 5 – UNSW STANDARD PRELIMINARIES Rev 4.1 (Sept 2005)

APPENDIX 6 – UNSW SECURITY SPECIFICATIONS Rev 4.10 (Feb 2009)

Please note also that any contractor or sub-contractor, including all their employees, working on any University controlled property must be site inducted to the requirements of:

UNSW SITE SPECIFIC OHS INDUCTION HANDBOOK


     
    Contact Facilities Management by Phone on 9385 5111 or by email at FMcustomerservice@unsw.edu.au
    Authorised by: Facilities Management | C22 Chancellery L2 | UNSW Sydney NSW 2052 Australia
    Web Enquiries: Site Administrator | Updated: 06-May-2005 | CRICOS CODE: 00098G | Disclaimer | ©UNSW
    UNSW Facilities